335,000 LB Crude Tower was lifted 50 feet high over a working process unit. Tower dimensions: 18′ x 155′
View detailsAfter nearly a year of planning, our Liebherr LR 1500 was the perfect match for this unique job. A 275,000 lb heater vessel was raised through a 125 ft tall roof.
View detailsExciting lift with a 50 foot Ball Mill weighing in at 410,000 lbs! It was estimated to weigh less, but we came prepared to lift more! 💪🏼
View detailsFor 18 months, we planned and engineered the replacement of the Crusher Shell components weighing up to 320,000 pounds with our two Liebherr 1300 SX Crawler Cranes.
View detailsOur #GMK7550 and #LTM1750 worked together on spans that required 5 different crane moves and the girders weighed up to 180,000 pounds!
View detailsDue to the location of the bridge and how it ties into the building on the North side, this bridge needed to be placed prior to building any of the Phase 5 structure.
View detailsBuilding Salt Lake City one crane at a time. We teamed up with Okland and Hensel Phelps to build a tower crane that will build the new Hyatt Regency hotel in downtown Salt Lake.
View detailsHow do you install a pedestrian bridge that is 220 feet long and weighs 187,000 pounds? Together with D.R. Horton and Noland Construction, we got the job done!
View detailsWe setup our 900 Ton crane in about as tight of a space as we could, in order to break down the tower crane on the 111 Main building.
View detailsWe worked with Zwick Construction on the Cedar City LDS Temple. One of the highlights was hoisting the 80,000-pound spire structure into position.
View detailsTo make way for the Eccles Theatre in downtown Salt Lake, we helped demolish the old buildings.
View detailsTough, complicated lift through the night as Bangerter Blvd was closed down.
View detailsIt’s not every day we get to hang out with a world-famous band.
View detailsThe construction of this luxury resort situated at 8,600 ft required special attention to detail.
View detailsThe Rio Tinto Kennecott Smelter has been operating for over 20 years. We’re there to keep it running for decades to come.
View detailsWagstaff Crane and Gerber Construction team up to lift a 170,000 pound digester lid at the North Salt Lake Waste Water Treatment Facility.
View details