Projects

335,000 LBS Crude Tower

335,000 LB Crude Tower was lifted 50 feet high over a working process unit. Tower dimensions: 18′ x 155′

View details

Project Argo

After nearly a year of planning, our Liebherr LR 1500 was the perfect match for this unique job. A 275,000 lb heater vessel was raised through a 125 ft tall roof.

View details

Ouray Ball Mill Relocation

Exciting lift with a 50 foot Ball Mill weighing in at 410,000 lbs! It was estimated to weigh less, but we came prepared to lift more! 💪🏼

View details

Crusher Shell Replacement

For 18 months, we planned and engineered the replacement of the Crusher Shell components weighing up to 320,000 pounds with our two Liebherr 1300 SX Crawler Cranes.

View details

Snake River Bridge Expansion

Our #GMK7550 and #LTM1750 worked together on spans that required 5 different crane moves and the girders weighed up to 180,000 pounds!

View details

Huntsman Cancer 900 Ton

Due to the location of the bridge and how it ties into the building on the North side, this bridge needed to be placed prior to building any of the Phase 5 structure.

View details

1450 Tower Crane

Building Salt Lake City one crane at a time. We teamed up with Okland and Hensel Phelps to build a tower crane that will build the new Hyatt Regency hotel in downtown Salt Lake.

View details

Lehi Bridge

How do you install a pedestrian bridge that is 220 feet long and weighs 187,000 pounds? Together with D.R. Horton and Noland Construction, we got the job done!

View details

111 Main Tower Crane

We setup our 900 Ton crane in about as tight of a space as we could, in order to break down the tower crane on the 111 Main building.

View details

Cedar City Temple

We worked with Zwick Construction on the Cedar City LDS Temple. One of the highlights was hoisting the 80,000-pound spire structure into position.

View details

Main Street Demolition

To make way for the Eccles Theatre in downtown Salt Lake, we helped demolish the old buildings.

View details

Bangerter Bridge

Tough, complicated lift through the night as Bangerter Blvd was closed down.

View details

U2 Stage Set-Up at Rice-Eccles Stadium

It’s not every day we get to hang out with a world-famous band.

View details

Montage Deer Valley

The construction of this luxury resort situated at 8,600 ft required special attention to detail.

View details

Rio Tinto Kennecott

The Rio Tinto Kennecott Smelter has been operating for over 20 years. We’re there to keep it running for decades to come.

View details

Digester Lid

Wagstaff Crane and Gerber Construction team up to lift a 170,000 pound digester lid at the North Salt Lake Waste Water Treatment Facility.

View details