Lehi Bridge

Lehi, Utah

Project details

default default

As a new development is being built in Lehi, a pedestrian bridge needed to be installed. It’s not a typical pedestrian bridge at 220 feet long and weighs 187,000 pounds. Working with D.R. Horton and Noland Construction, we are proud of what we were able to accomplish together.